Quick answers
What is this project?
"Building Stone Sand Stone" Project at Gata No.- 396Ka, Village- Hadaura, Tehsil- Madihan, District- Mirzapur, U.P. (Applied Area : 2.130 ha.) Prop.- Shri Amit Kumar Singh S/o Shri Vijay Bahadur Singh is an approved mining project in Haraura, Marihan, Mirzapur, Uttar Pradesh. The site covers 5.3 acres.
Who is building it?
The applicant is Amit Kumar Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Nov 2024), as of 27 Nov 2026.
Where is it?
In Haraura, Marihan, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹81 lakh and a site of 5.3 acres.
When was it filed?
The application was filed on 4 Sept 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Nov 2024 |
| Application filed | 4 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Amit Kumar Singh |
| Land area | 5.3 acres (2.1 ha) |
| Project cost | ₹81 lakh |
| Village / locality | Haraura |
| Taluk / tehsil | Marihan |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02558 |
In context
404 applications in Mirzapur since January 2022 are in the same category (Mining): 312 approved, 49 filed or under review, and 43 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 5.3 acres, this one is larger than 80% of them.
No other mining lease on record is within 500 m of this site; 3 have applied within 5 km.
Where it is
Haraura, Marihan, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Widening and Strengthening of road — lapsed, 3.9 km away
- Imarati Patthar Sandstone Mine at Araji/Gata No.-1537Ra, Lease area- 2.21 Ha.,… — environmental approval granted, 4.5 km away
- Building Stone Sandstone Mining Project — environmental approval granted, 4.7 km away
- Building Stone Sandstone Mining Project — cleared for impact study, 4.7 km away
- Bahuti Building stone Sand Stone Mining project — environmental approval granted, 4.7 km away
- Bahuti Building stone Sand Stone Mining project — cleared for impact study, 4.7 km away
- Request for Name Change of User Agency from Welspun Energy UP Private Limited… — in-principle approval, conditions pending, 5.5 km away
- Laying of proposed 33 kV Transmission Line from 132/33kV Gurudev Nagar SS to… — in-principle approval, conditions pending, 7.7 km away
More from Amit Kumar Singh in Mirzapur
- "Building Stone (Sandstone) Mine" at Gata No.- 997 Mi (01), Lease area- 2.23… — under environmental review
- "Building Stone (Sandstone) Mine" at Gata No.- 997 Mi (01), Lease area- 2.23… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.