Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Bamhrauli, Khaga, Fatehpur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 18 Aug 2026), as of 27 Nov 2026.
Where is it?
In Bamhrauli, Khaga, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.8 acres and 100 m² of forest land.
When was it filed?
The application was filed on 8 Jul 2026.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Bamhrauli, Tehsil:- Khaga, District:- Fatehpur. |
|---|---|
| Status | Forest land use approved |
| Status since | 18 Aug 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3,400 m² |
| Forest land | 100 m² |
| Project cost | ₹55 lakh |
| Village / locality | Bamhrauli |
| Taluk / tehsil | Khaga |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-05901 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.8 acres, this one is larger than 52% of them.
Where it is
Bamhrauli, Khaga, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sand/Morrum Mining at river Bed of Yamuna River, Khand No.-R-3 , Gata No. 34… — environmental approval granted, 5.1 km away
- Sand/Morrum Mining at river Bed of Yamuna River, Khand No.-R-3 , Gata No. 34… — cleared for impact study, 5.1 km away
- "Sand/Morrum Mining" from Riverbed of Yamuna River — under environmental review, 6.2 km away
- Salempur Sand/Morrum Mining Project at Khand No. SP- 1 & 2 Gata No. 33, 34,… — environmental approval granted, 7.1 km away
- Salempur Sand/Morrum Mining Project at Khand No. SP- 1 & 2 Gata No. 33, 34,… — cleared for impact study, 7.1 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — in-principle approval, conditions pending, 10.3 km away
- Bharat Net — lapsed, 15.6 km away
- Sand/Morrum Mining at river Bed of Yamuna River, Block No. - Gata of Coat… — environmental approval granted, 15.7 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Fatehpur
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — under forest review
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — in-principle approval, conditions pending
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
10 Hindustan Petroleum Corporation (HPCL) projects in Fatehpur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.