Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail Out-let is an approved fuel station in Chak Bisauli, Fatehpur, Uttar Pradesh. The site covers 0.4 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 4 Jun 2025), as of 27 Nov 2026.
Where is it?
In Chak Bisauli, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.4 acres and 540 m² of forest land.
When was it filed?
The application was filed on 5 May 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail Out-let at Village:- Chak Bisauli, Tehsil:- Sadar, District:- Fatehpur |
|---|---|
| Status | Forest land use approved |
| Status since | 4 Jun 2025 |
| Application filed | 5 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1,700 m² |
| Forest land | 540 m² |
| Project cost | ₹55 lakh |
| Village / locality | Chak Bisauli |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06261 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.4 acres, this one is smaller than 90% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chak Bisauli, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 1.6 km away
- Common Bio Medical Waste Treatment Facility (CBWTF) M/s Gopal Complex Fatehpur — under environmental review, 2 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 2 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 4.1 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — forest land use approved, 4.9 km away
- Laying of CS Gas Pipe Line (200mm) — forest land use approved, 5.3 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 5.3 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 7.5 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Fatehpur
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — under forest review
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
10 Hindustan Petroleum Corporation (HPCL) projects in Fatehpur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.