Quick answers
What is this project?
Proposed HPCL Retail Outlet on Lumbini-Duddhi Road (SH-5) in Km No. 345 to 346 (LHS) at Arazi No–501G, Village:- Rajapur, Tehsil:- Madihan, District:- Mirzapur is a lapsed fuel station in Atraura, Marihan, Mirzapur, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 27 Jun 2026, so it is no longer under consideration.
Where is it?
In Atraura, Marihan, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.5 acres and 750 m² of forest land.
When was it filed?
The application was filed on 9 Oct 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed HPCL Retail Outlet on Lumbini-Duddhi Road (SH-5) in Km No. 345 to 346 (LHS) at…
Project details
| Status | Lapsed |
|---|---|
| Status since | 27 Jun 2026 |
| Application filed | 9 Oct 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 2,000 m² |
| Forest land | 750 m² |
| Project cost | ₹55 lakh |
| Village / locality | Atraura |
| Taluk / tehsil | Marihan |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05904 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 6 Feb 2023 | Forest land use approved | 0.5 acres | ₹55 lakh |
| New project filed 9 Oct 2022 (this page) | Lapsed | 0.5 acres | ₹55 lakh |
In context
10 applications in Mirzapur since January 2022 are in the same category (Fuel stations): 4 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.5 acres, this one is smaller than 90% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Atraura, Marihan, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed HPCL Retail Outlet on Lumbini-Duddhi Road (SH-5) in Km No. 345 to 346… — forest land use approved, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 200 m away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — more information requested, 2.5 km away
- Building Stone (Sand stone) Mining Project — environmental approval granted, 4.9 km away
- Proposed project of "Sand Stone Quartizite Ballast Gitti Mining" located at… — environmental approval granted, 5.2 km away
- Proposed project of "Sand Stone Quartizite Ballast Gitti Mining" located at… — cleared for impact study, 5.2 km away
- "Building Stone (Sand Stone)" Project at Gata No.- 488/2 & 488/3, Village-… — lapsed, 5.2 km away
- "Building Stone (Sand Stone)" Project at Gata No.- 488/2 & 488/3, Village-… — cleared for impact study, 5.2 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Mirzapur
3 Hindustan Petroleum Corporation (HPCL) projects in Mirzapur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.