What is this project?
Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet is a proposed fuel station in Marihan, Mirzapur, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Marihan, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1 acre and 2,250 m² of forest land.
When was it filed?
The application was filed on 25 Feb 2026.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village: - Madihan, Tehsil: - Madihan, District: - Mirzapur (Uttar Pradesh). |
|---|---|
| Status | More information requested |
| Status since | 22 Oct 2026 |
| Application filed | 25 Feb 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,900 m² |
| Forest land | 2,250 m² |
| Project cost | ₹60 lakh |
| Village / locality | Marihan |
| Taluk / tehsil | Marihan |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06667 |
In context
10 applications in Mirzapur since January 2022 are in the same category (Fuel stations): 4 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. At 1 acre, this one is larger than 80% of them.
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Marihan, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed HPCL Retail Outlet on Lumbini-Duddhi Road (SH-5) in Km No. 345 to 346… — forest land use approved, 2.5 km away
- Proposed HPCL Retail Outlet on Lumbini-Duddhi Road (SH-5) in Km No. 345 to 346… — lapsed, 2.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 2.7 km away
- Building Stone (Sand stone) Mining Project — environmental approval granted, 3 km away
- Proposed project of "Sand Stone Quartizite Ballast Gitti Mining" located at… — environmental approval granted, 3.2 km away
- Proposed project of "Sand Stone Quartizite Ballast Gitti Mining" located at… — cleared for impact study, 3.2 km away
- "Building Stone (Sand Stone)" Project at Gata No.- 488/2 & 488/3, Village-… — lapsed, 3.4 km away
- "Building Stone (Sand Stone)" Project at Gata No.- 488/2 & 488/3, Village-… — cleared for impact study, 3.4 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Mirzapur
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
3 Bharat Petroleum Corporation (BPCL) projects in Mirzapur
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.