Quick answers
What is this project?
Jhansi-Mahoba - Khairar Section including Chord line at Mahoba, Khairar & Khajuraho in connection with Jhansi - Manikpur and Khairar - Bhimsen Doubling work is an approved railway project in Bangawan, Jhansi, Uttar Pradesh. The site covers 11.4 acres.
Who is building it?
The applicant is Deputy Chief Engineer (Const.-I), North Central Railway, Jhanshi.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Apr 2026), as of 27 Nov 2026.
Where is it?
In Bangawan, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4,329.5 crore; a site of 11.4 acres and 11.4 acres (4.6 ha) of forest land.
When was it filed?
The application was filed on 22 Jan 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 22 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Deputy Chief Engineer (Const.-I), North Central Railway, Jhanshi |
| Land area | 11.4 acres (4.6 ha) |
| Forest land | 11.4 acres (4.6 ha) |
| Project cost | ₹4,329.5 crore |
| Village / locality | Bangawan |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05907 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bangawan, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land Falling within the Land specified for the… — more information requested, 3.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 3.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 8.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 9.7 km away
- Proposed Indian Oil Corporation Limited Retail Outlet on Gursarai-Mauranipur… — forest land use approved, 10.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 10.9 km away
- Sand/Morrum Mining From Sukhnai Riverbed — cleared for impact study, 11.2 km away
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — environmental approval granted, 11.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.