Quick answers
What is this project?
Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Pachauro, Mauranipur, Jhansi, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 16 Apr 2026), as of 27 Nov 2026.
Where is it?
In Pachauro, Mauranipur, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 1 acre and 2,080 m² of forest land.
When was it filed?
The application was filed on 8 May 2025.
Project details
| Official title | Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Pachauro, Tehsil:- Mauranipur, District:- Jhansi. |
|---|---|
| Status | Forest land use approved |
| Status since | 16 Apr 2026 |
| Application filed | 8 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1 acres (0.4 ha) |
| Forest land | 2,080 m² |
| Project cost | ₹55 lakh |
| Village / locality | Pachauro |
| Taluk / tehsil | Mauranipur |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06579 |
In context
31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 1 acre, this one is larger than 55% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pachauro, Mauranipur, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 1.8 km away
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — environmental approval granted, 2 km away
- Proposed "River Bed Sand/ Morrum Mining" from River bed of Sukhnai River at… — cleared for impact study, 2 km away
- Sand/Morrum Mining From Sukhnai Riverbed — cleared for impact study, 2 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 4.1 km away
- Proposed Indian Oil Corporation Limited Retail Outlet on Gursarai-Mauranipur… — forest land use approved, 6 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 6.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 7.4 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Jhansi
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — more information requested
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be diverted for Entry/Exit of approach to… — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved
8 Bharat Petroleum Corporation (BPCL) projects in Jhansi
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.