What is Developing? Open the mapMap

Forest land use approvedFuel stations · Fatehpur, Uttar Pradesh

Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Indian Oil Corporation Limited Retail Outlet on Village:- Baundar, Tehs Il:- Fatehpur, Dis Trict:- Fatehpur.

Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Indian Oil Corporation Limited Retail Outlet on Village:- Baundar, Tehs Il:- Fatehpur, Dis Trict:- Fatehpur is an approved fuel station in Baundar, Fatehpur, Uttar Pradesh. The site covers 0.5 acres. Its stated project cost is ₹50 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 26 Sept 2023).

See it on the live map All projects in Fatehpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Indian Oil Corporation Limited Retail Outlet on Village:- Baundar, Tehs Il:- Fatehpur, Dis Trict:- Fatehpur is an approved fuel station in Baundar, Fatehpur, Uttar Pradesh. The site covers 0.5 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 26 Sept 2023), as of 27 Nov 2026.

Where is it?

In Baundar, Fatehpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹50 lakh; a site of 0.5 acres and 1,230 m² of forest land.

When was it filed?

The application was filed on 26 Feb 2023.

Project details

StatusForest land use approved
Status since26 Sept 2023
Application filed26 Feb 2023
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area2,100 m²
Forest land1,230 m²
Project cost₹50 lakh
Village / localityBaundar
Taluk / tehsilFatehpur
DistrictFatehpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05960

In context

50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.5 acres, this one is smaller than 82% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Baundar, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Fatehpur

13 Indian Oil Corporation (IOCL) projects in Fatehpur
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.