What is Developing? Open the mapMap

More information requestedFuel stations · Fatehpur, Uttar Pradesh

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a proposed fuel station in Manawan, Fatehpur, Uttar Pradesh. The site covers 0.9 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “More information requested” (since 3 Nov 2026).

See it on the live map All projects in Fatehpur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a proposed fuel station in Manawan, Fatehpur, Uttar Pradesh. The site covers 0.9 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.

Where is it?

In Manawan, Fatehpur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹55 lakh; a site of 0.9 acres and 920 m² of forest land.

When was it filed?

The application was filed on 2 Aug 2026.

Project details

Official titleProposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:-Manawa, Tehsil:-Fatehpur Sadar, District:- Fatehpur (Uttar Pradesh)
StatusMore information requested
Status since3 Nov 2026
Application filed2 Aug 2026
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area3,500 m²
Forest land920 m²
Project cost₹55 lakh
Village / localityManawan
Taluk / tehsilFatehpur
DistrictFatehpur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06098

In context

50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.9 acres, this one is larger than 62% of them.

5 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Manawan, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Fatehpur

13 Indian Oil Corporation (IOCL) projects in Fatehpur
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.