Project details
| Official title | Proposal for Rediversion of 0.9960 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New Delhi Project for Laying of 8" NB Carbon Steel Gas Pipeline along NH - 709 AD (Janshatha flyover to Meeranpur) from KM. chainage 97.450 to KM. Chainage 122.350 (TOTAL Length 24.900 KM) Under Social Forestry Division Muzaffarnagar in Tehsil - Sadar & Janshatha in District - Muzaffarnagar, UTTAR PRADESH. |
|---|---|
| Status | Forest land use approved |
| Status since | 17 Apr 2026 |
| Application filed | 29 Aug 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Indraprastha Gas Limited |
| Land area | 2.5 acres (1 ha) |
| Forest land | 2.5 acres (1 ha) |
| Project cost | ₹1 crore |
| Village / locality | Musa (Shernagar) |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06016 |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Roads & highways): 6 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 2.5 acres, this one is larger than 62% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Musa (Shernagar), Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Re- diverted for Laying of steel Gas… — lapsed, 350 m away
- Proposed Protected Forest Land to be Re- diverted for Laying of steel Gas… — lapsed, 350 m away
- Amended BharatNet Project (Morna-Shakumbri-Muzzafarnagar) — lapsed, 6.9 km away
- Environmental Clearance for the Expansion of Existing Production Capacity of… — environmental approval granted, 7.5 km away
- Environmental Clearance for the Expansion of Existing Production Capacity of… — cleared for impact study, 7.5 km away
- production of TMT Bars 165000 MT/Year through rolling mill (CCM) and MS… — environmental approval granted, 8 km away
- production of TMT Bars 165000 MT/Year through rolling mill (CCM) and MS… — environmental approval granted, 8 km away
- production of TMT Bars 165000 MT/Year through rolling mill (CCM) and MS… — cleared for impact study, 8 km away
More from Indraprastha Gas Limited in Muzaffarnagar
- Diversion of 0.0617 Ha PF LAND in favor of M/S Indraprastha Gas Limited, New… — forest land use approved
- Diversion of 0.8111 Ha PF LAND in favor of M/S Indraprastha Gas Limited, New… — forest land use approved
- Diversion of Pf Land in Favour of M/S Indraprastha Gas Limited (Igl). New… — forest land use approved
- Proposal of 0.1621 Ha Protected Forest Land to Be Diverted for Entry and Exit… — forest land use approved
- Diversion of 0.9368 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New… — forest land use approved
6 Indraprastha Gas projects in Muzaffarnagar
All 84 Indraprastha Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.