Project details
| Official title | Proposed protected Forest Land to be diverted for Reconstruction of diversion of Section (Tower No. 389 to Tower No. 409) of 765KV D/C Varanasi-Kanpur Line (due to construction of Ganga Expressway by UPEIDA) Crossing on Lalganj Ajhara-Kalakankar Road in between Km. No. 16 to 17, in District:- Pratapgarh |
|---|---|
| Status | Forest land use approved |
| Status since | 27 Feb 2024 |
| Application filed | 25 Nov 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Power Grid Corporation of India (POWERGRID) |
| Land area | 1,800 m² |
| Forest land | 1,780 m² |
| Project cost | ₹117.4 crore |
| Village / locality | Sarai Nirbhau |
| Taluk / tehsil | Kunda |
| District | Pratapgarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06024 |
In context
8 applications in Pratapgarh since January 2022 are in the same category (Roads & highways): 3 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
Where it is
Sarai Nirbhau, Kunda, Pratapgarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to BPCL… — more information requested, 10.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — lapsed, 15.7 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 15.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 24.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — lapsed, 26.4 km away
- 2 Lane with Paved Shoulder Greenfield Bypass in Lalganj Ajhara Mohanganj and… — forest land use approved, 30.5 km away
- Protected Forest Land proposed to be diverted for the Construction of Over… — lapsed, 39.5 km away
- Protected Forest Land proposed to be diverted for the Construction of Over… — in-principle approval, conditions pending, 39.5 km away
All 45 Power Grid Corporation of India projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.