Project details
| Official title | Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Rampur Gadauli, Tehsil:- Kunda, District:- Pratapgarh. |
|---|---|
| Status | Lapsed |
| Status since | 29 May 2025 |
| Application filed | 15 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 2,700 m² |
| Forest land | 1,840 m² |
| Project cost | ₹50 lakh |
| Village / locality | Rampur Garauli |
| Taluk / tehsil | Kunda |
| District | Pratapgarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06252 |
In context
12 applications in Pratapgarh since January 2022 are in the same category (Fuel stations): 6 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.7 acres, this one is smaller than 83% of them.
Where it is
Rampur Garauli, Kunda, Pratapgarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected Forest Land to be diverted for Reconstruction of diversion… — forest land use approved, 15.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to BPCL… — more information requested, 25.8 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — lapsed, 26.3 km away
- Re-Diversion for Reliance 4g Project for Laying of Optical Fibre Cable (Ofc) — lapsed, 29 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 40.2 km away
- 2 Lane with Paved Shoulder Greenfield Bypass in Lalganj Ajhara Mohanganj and… — forest land use approved, 44.7 km away
- Protected Forest Land proposed to be diverted for the Construction of Over… — lapsed, 53.7 km away
- Protected Forest Land proposed to be diverted for the Construction of Over… — in-principle approval, conditions pending, 53.7 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Pratapgarh
- Proposed Protected Forest Land to be Diverted for Entry/Exit Approach to HPCL… — forest land use approved
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to HPCL… — lapsed
3 Hindustan Petroleum Corporation (HPCL) projects in Pratapgarh
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.