Quick answers
What is this project?
Diversion of Protected Forest Land for Construction of Approach Road to the Retail Outlet of Indian Oil Corporation Limited Located on Palwal-Aligarh Road (Nh-334d) Km 40 Chainage 39.398 (L.H.S.) on Khasra No. 90, Village- Bajhera, Tehsil-Khair, Disrict-Aligarh is an approved fuel station in Bajhera, Khair, Aligarh, Uttar Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 2 Sept 2025), as of 27 Nov 2026.
Where is it?
In Bajhera, Khair, Aligarh, Uttar Pradesh.
How big is it?
It has a stated cost of ₹80 lakh; a site of 0.6 acres and 760 m² of forest land.
When was it filed?
The application was filed on 5 May 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 2 Sept 2025 |
| Application filed | 5 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 2,500 m² |
| Forest land | 760 m² |
| Project cost | ₹80 lakh |
| Village / locality | Bajhera |
| Taluk / tehsil | Khair |
| District | Aligarh |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06033 |
In context
25 applications in Aligarh since January 2022 are in the same category (Fuel stations): 14 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.6 acres, this one is smaller than 80% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bajhera, Khair, Aligarh, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Mining of Minor Mineral "Soil Excavation Project" — environmental approval granted, 4.9 km away
- Diversion of Protected Forest Land for Construction of Approach Road to the… — initial checks, 6.3 km away
- Jaypee Greens Wish Town, Tappal — more information requested, 10.2 km away
- Jaypee Greens Wish Town, Tappal — cleared for impact study, 10.2 km away
- Environmental Clearance of proposed production of 3,75,000 TPA Steel Billets… — environmental approval granted, 11.1 km away
- Amended BharatNet Project (Khair-Aligarh) — lapsed, 11.6 km away
- Diversion of Protected Forest Land for Construction of underground 33 KV line… — forest land use approved, 11.6 km away
- Amended BharatNet Project (Chandaus-Aligarh) — lapsed, 16 km away
More from Indian Oil Corporation Limited (IOCL) in Aligarh
- Diversion of protected forest land for Construction of approach road to the… — under forest review
- Proposed PF land to be diverted for Entry and Exit of IOCL retail Outlet on… — lapsed
- Diversion of Protected Forest Land for Construction of Approach Road to the… — forest land use approved
- Diversion of protected forest land for construction of approach road to the… — in-principle approval, conditions pending
- Diversion of Protected Forest Land for construction of approach road to the… — forest land use approved
- Fuel station by Indian Oil Corporation Limited — forest land use approved
12 Indian Oil Corporation (IOCL) projects in Aligarh
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.