What is Developing? Open the mapMap

Forest land use approvedFuel stations · Bijnor, Uttar Pradesh

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Raoti, Chandpur, Bijnor, Uttar Pradesh. The site covers 0.8 acres. Its stated project cost is ₹65 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 24 Mar 2026).

See it on the live map All projects in Bijnor

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Raoti, Chandpur, Bijnor, Uttar Pradesh. The site covers 0.8 acres.

Who is building it?

The applicant is Indian Oil Corporation Limited (IOCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 24 Mar 2026), as of 27 Nov 2026.

Where is it?

In Raoti, Chandpur, Bijnor, Uttar Pradesh.

How big is it?

It has a stated cost of ₹65 lakh; a site of 0.8 acres and 1,860 m² of forest land.

When was it filed?

The application was filed on 20 Dec 2025.

Project details

Official titleProposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail Outlet at Village:-Ravti, Tehsil:-Chandpur, District:-Bijnor
StatusForest land use approved
Status since24 Mar 2026
Application filed20 Dec 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area3,100 m²
Forest land1,860 m²
Project cost₹65 lakh
Village / localityRaoti
Taluk / tehsilChandpur
DistrictBijnor
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06073

In context

19 applications in Bijnor since January 2022 are in the same category (Fuel stations): 10 approved, 2 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.8 acres, this one is smaller than 68% of them.

Where it is

Raoti, Chandpur, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Bijnor

11 Indian Oil Corporation (IOCL) projects in Bijnor
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.