What is Developing? Open the mapMap

Initial checksRoads & highways · Bijnor, Uttar Pradesh

Proposed Protected Forest Land To Be Diverted (Forest Conservation Act 1980 For Non-Forestry Purpose) For Construction Of BadaunBilsi-Islamnagar-Bhoji-Sambhal-Hasanpur-Gajraula-Bijnor Road (S.H.-51) Chainage 190.000 To Chainage 200.000 Total Length 10.000 Km Widening/Strengthning Of Road In The Financial Year 2026-2027 Under Dharmarth Yojna By PD PWD Bijnor Under Social Forestry Division Bijnor

Proposed Protected Forest Land To Be Diverted (Forest Conservation Act 1980 For Non-Forestry Purpose) For Construction Of BadaunBilsi-Islamnagar-Bhoji-Sambhal-Hasanpur-Gajraula-Bijnor Road (S.H.-51) Chainage 190.000 To Chainage 200.000 Total Length 10.000 Km Widening/Strengthning Of Road In The Financial Year 2026-2027 Under Dharmarth Yojna By PD PWD Bijnor Under Social Forestry Division Bijnor is a proposed road project in Meeropur Agri, Bijnor, Uttar Pradesh. The site covers 7.4 acres. Its stated project cost is ₹24.9 crore. As of 27 Nov 2026, its status is “Initial checks” (since 25 Nov 2026).

See it on the live map All projects in Bijnor

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land To Be Diverted (Forest Conservation Act 1980 For Non-Forestry Purpose) For Construction Of BadaunBilsi-Islamnagar-Bhoji-Sambhal-Hasanpur-Gajraula-Bijnor Road (S.H.-51) Chainage 190.000 To Chainage 200.000 Total Length 10.000 Km Widening/Strengthning Of Road In The Financial Year 2026-2027 Under Dharmarth Yojna By PD PWD Bijnor Under Social Forestry Division Bijnor is a proposed road project in Meeropur Agri, Bijnor, Uttar Pradesh. The site covers 7.4 acres.

Who is building it?

The applicant is Provincial Division Pwd Bijnor.

Has it been approved?

Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.

Where is it?

In Meeropur Agri, Bijnor, Uttar Pradesh.

How big is it?

It has a stated cost of ₹24.9 crore; a site of 7.4 acres and 7.4 acres (3 ha) of forest land.

When was it filed?

The application was filed on 25 Nov 2026.

Project details

Official titleProposed Protected Forest Land To Be Diverted (Forest Conservation Act 1980 For Non-Forestry Purpose) For Construction Of BadaunBilsi-Islamnagar-Bhoji-Sambhal-Hasanpur-Gajraula-Bijnor Road (S.H.-51) Chainage 190.000 To Chainage 200.000 Total Length 10.000 Km Widening/Strengthning Of Road In The Financial Year 2026-2027 Under Dharmarth Yojna By PD PWD Bijnor Under Social Forestry Division Bijnor In District Bijnor Uttar Pradesh.
StatusInitial checks
Status since25 Nov 2026
Application filed25 Nov 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantProvincial Division Pwd Bijnor
Land area7.4 acres (3 ha)
Forest land7.4 acres (3 ha)
Project cost₹24.9 crore
Village / localityMeeropur Agri
Taluk / tehsilBijnor
DistrictBijnor
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-07599

In context

22 applications in Bijnor since January 2022 are in the same category (Roads & highways): 8 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 7.4 acres, this one is smaller than 58% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Meeropur Agri, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Provincial Division Pwd Bijnor in Bijnor

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.