Project details
| Official title | Proposed Reserved Forest Land to be diverted for construction of Yamuna River Bridge at Shergarh Ghat of Bilrayan-Panwari Road, in District:- Jalaun |
|---|---|
| Status | Forest land use approved |
| Status since | 10 Jun 2026 |
| Application filed | 1 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Up State Bridge Corporation Limited Bridge Construction Unit Orai |
| Land area | 1.9 acres (0.8 ha) |
| Forest land | 3,090 m² |
| Project cost | ₹151.3 crore |
| Village / locality | Qasba Khanpur |
| Taluk / tehsil | Auraiya |
| District | Auraiya |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06107 |
In context
7 applications in Auraiya since January 2022 are in the same category (Roads & highways): 2 approved, 2 filed or under review, and 3 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Qasba Khanpur, Auraiya, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Earth Mining — environmental approval granted, 1.2 km away
- "Ordinary Soil Mining" Project at Gata No.-119, Village- Sarsai Mustakil,… — under environmental review, 2.2 km away
- "Ordinary Soil Mining Project" — environmental approval granted, 4.6 km away
- "Ordinary Soil Mining" Project at Gata No.- 973ख, Village-Madnai Mustaquil,… — environmental approval granted, 6.2 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 6.6 km away
- Proposed Protected Forest Land to Be Diverted for Widening and Strengthening… — lapsed, 7.6 km away
- "Ordinary Soil Mining" Project at Gata No.- 716, Village- Maharatpur, Tehsil-… — environmental approval granted, 8.4 km away
- "Ordinary Soil Excavation Project" at Gata No.- 64, 100, Village- Malehpur,… — environmental approval granted, 8.8 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.