Quick answers
What is this project?
HPCL Retail Outlet on Airaya Allipur Jeeta Marg (MDR-81C) , In KM Stone No. 26 Ch.25.600 (LHS), At Gata No.976,978,979 Village: Lakhmipur ,Pargna: Hathgam, Tehsil: Khaga, District: Fatehpur (UP) is a lapsed building project in Lakhmipur, Khaga, Fatehpur, Uttar Pradesh. The site covers 0.7 acres.
Who is building it?
The applicant is Hindustan Petrolium Corporation Limited.
Has it been approved?
No. The application was lapsed on 17 Jan 2025, so it is no longer under consideration.
Where is it?
In Lakhmipur, Khaga, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.7 acres and 1,700 m² of forest land.
When was it filed?
The application was filed on 19 Sept 2022.
One of 2 filings for this project. The project's main page, with every filing and where each stands: HPCL Retail Outlet on Airaya Allipur Jeeta Marg (MDR-81C) , In KM Stone No. 26 Ch.25.600…
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Jan 2025 |
| Application filed | 19 Sept 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Hindustan Petrolium Corporation Limited |
| Land area | 2,900 m² |
| Forest land | 1,700 m² |
| Project cost | ₹45 lakh |
| Village / locality | Lakhmipur |
| Taluk / tehsil | Khaga |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06186 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 29 Nov 2022 | Forest land use approved | 0.7 acres | ₹45 lakh |
| New project filed 19 Sept 2022 (this page) | Lapsed | 0.7 acres | ₹45 lakh |
Where it is
Lakhmipur, Khaga, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- HPCL Retail Outlet on Airaya Allipur Jeeta Marg (MDR-81C) , In KM Stone No. 26… — forest land use approved, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 9.8 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — lapsed, 10.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 11.4 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved, 12.1 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — in-principle approval, conditions pending, 12.5 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 14.2 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 14.2 km away
All 8 Hindustan Petrolium Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.