Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on Khaga Kishanpur Marg (ODR) in Km. 4 Ch. 3.180 (LHS) at Gata No. 1518, Village: Hardoan IInd (Nagar Panchayat Khaga), Tehsil-Khaga, District: Fatehpur (Uttar Pradesh) is an approved fuel station in Hardon, Khaga, Fatehpur, Uttar Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 9 Apr 2025), as of 27 Nov 2026.
Where is it?
In Hardon, Khaga, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 0.3 acres and 460 m² of forest land.
When was it filed?
The application was filed on 5 Mar 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 9 Apr 2025 |
| Application filed | 5 Mar 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1,100 m² |
| Forest land | 460 m² |
| Project cost | ₹45 lakh |
| Village / locality | Hardon |
| Taluk / tehsil | Khaga |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06582 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.3 acres, this one is smaller than 96% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hardon, Khaga, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 0 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 3.6 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to… — forest land use approved, 3.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved, 7.7 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 8.7 km away
- Laying of 24 F OF cable from Pandu Nadi( Kanpur- Fatehpur Border) to Fatehpur… — lapsed, 9.5 km away
- Laying of 24 F OF cable from Pandu Nadi( Kanpur- Fatehpur Border) to Fatehpur… — lapsed, 9.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Reliance BP… — lapsed, 11 km away
More from Indian Oil Corporation Limited (IOCL) in Fatehpur
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
13 Indian Oil Corporation (IOCL) projects in Fatehpur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.