Quick answers
What is this project?
Proposed Forest Land to be diverted to BPCL Retail Outlet at Naugawan Sadat-Amroha Road (SH -77), Khasra/Gata No-189/2, Vill- Peela Kund, Tehsil-Naugawan Sadat, Distt- Amroha is an approved fuel station in Pilakund, Amroha, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 20 Oct 2025), as of 27 Nov 2026.
Where is it?
In Pilakund, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.5 acres and 690 m² of forest land.
When was it filed?
The application was filed on 4 May 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 20 Oct 2025 |
| Application filed | 4 May 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1,900 m² |
| Forest land | 690 m² |
| Project cost | ₹65 lakh |
| Village / locality | Pilakund |
| Taluk / tehsil | Amroha |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06194 |
In context
30 applications in Amroha since January 2022 are in the same category (Fuel stations): 20 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.5 acres, this one is smaller than 93% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pilakund, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted to IOCL Retail Outlet at Noorpur-Amroha… — lapsed, 600 m away
- Entry & Exit for Vinayak Banquet Hall Protected land is is required to be… — forest land use approved, 850 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 2.3 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to Reliance BP… — in-principle approval, conditions pending, 4.2 km away
- "Ordinary Earth Mining" Project at Khasra/Gata No. 12, 18ka, 17ka 26ka, 11 &… — initial checks, 4.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 5.2 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to M/s… — forest land use approved, 5.8 km away
- Ordinary Soil Mine — under environmental review, 6.5 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Amroha
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved
- New Retail Outlet of Bpcl Meerut, Forest Land Is Required to Be Diverted As… — forest land use approved
4 Bharat Petroleum Corporation (BPCL) projects in Amroha
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.