What is Developing? Open the mapMap

Forest land use approvedFuel stations · Amroha, Uttar Pradesh

Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet

Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Sheonali, Amroha, Uttar Pradesh. The site covers 0.8 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 19 Feb 2025).

See it on the live map All projects in Amroha

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Sheonali, Amroha, Uttar Pradesh. The site covers 0.8 acres.

Who is building it?

The applicant is Bharat Petroleum Corporation Limited (BPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 19 Feb 2025), as of 27 Nov 2026.

Where is it?

In Sheonali, Amroha, Uttar Pradesh.

How big is it?

It has a stated cost of ₹60 lakh; a site of 0.8 acres and 1,780 m² of forest land.

When was it filed?

The application was filed on 11 Jul 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet

Project details

Official titleProposed forest land to be diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Syonali, Tehsil:- Amroha, District:- Amroha
StatusForest land use approved
Status since19 Feb 2025
Application filed11 Jul 2024
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantBharat Petroleum Corporation Limited (BPCL)
Land area3,400 m²
Forest land1,780 m²
Project cost₹60 lakh
Village / localitySheonali
Taluk / tehsilAmroha
DistrictAmroha
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05300

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 30 Oct 2024Forest land use approved1.1 acres₹65 lakh
New project filed 11 Jul 2024 (this page)Forest land use approved0.8 acres₹60 lakh

In context

30 applications in Amroha since January 2022 are in the same category (Fuel stations): 20 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.8 acres, this one is larger than 50% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sheonali, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharat Petroleum Corporation Limited (BPCL) in Amroha

4 Bharat Petroleum Corporation (BPCL) projects in Amroha
All 656 Bharat Petroleum Corporation (BPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.