Quick answers
What is this project?
Proposed Reserved Forest Land to Be Diverted for Construction and Its Protective Work of Approach Road to Major Bridge is a proposed road project in Tendua Asnahara, Bhanpur, Basti, Uttar Pradesh. The site covers 3.4 acres.
Who is building it?
The applicant is Up State Bridge Corporation Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Tendua Asnahara, Bhanpur, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹9.5 crore; a site of 3.4 acres and 2,620 m² of forest land.
When was it filed?
The application was filed on 20 Nov 2023.
Project details
| Official title | Proposed Reserved Forest Land to Be Diverted for Construction and Its Protective Work of Approach Road to Major Bridge in District:-Gonda & Basti (Up). |
|---|---|
| Status | More information requested |
| Status since | 1 Jun 2024 |
| Application filed | 20 Nov 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Up State Bridge Corporation Limited |
| Land area | 3.4 acres (1.4 ha) |
| Forest land | 2,620 m² |
| Project cost | ₹9.5 crore |
| Village / locality | Tendua Asnahara |
| Taluk / tehsil | Bhanpur |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06293 |
In context
7 applications in Basti since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 1 withdrawn, lapsed or rejected.
Where it is
Tendua Asnahara, Bhanpur, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 8.5 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 11.7 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — lapsed, 12 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 12 km away
- Proposed Protected Forest Land to be diverted for construction of new… — lapsed, 15.4 km away
- Ordinary Soil Mining Project — environmental approval granted, 16.5 km away
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Anita Distillery… — environmental approval granted, 19.7 km away
- Proposed Grain Based Distillery Capacity – 200 Kld by M/S Anita Distillery… — environmental approval granted, 19.7 km away
All 17 Up State Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.