Proposed Protected Forest Land to be diverted for construction of new connecting railway line approach to FCI Godown and NCML Basti Pvt. Ltd. (from Km. No. 0+403 to 1+003) is a lapsed railway project in Ama, Bhanpur, Basti, Uttar Pradesh. The site covers 20.5 acres.
Who is building it?
The applicant is Central Public Works Department.
Has it been approved?
No. The application was lapsed on 25 May 2023, so it is no longer under consideration.
Where is it?
In Ama, Bhanpur, Basti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹46 crore; a site of 20.5 acres and 1.6 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 5 Feb 2023.
Project details
| Official title | Proposed Protected Forest Land to be diverted for construction of new connecting railway line approach to FCI Godown and NCML Basti Pvt. Ltd. (from Km. No. 0+403 to 1+003) along with existing Tinich-Gaur Rail Section (Km. No. 583/9-584/5), in District: Basti (Uttar Pradesh). |
|---|---|
| Status | Lapsed |
| Status since | 25 May 2023 |
| Application filed | 5 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Central Public Works Department |
| Land area | 20.5 acres (8.3 ha) |
| Forest land | 1.6 acres (0.7 ha) |
| Project cost | ₹46 crore |
| Village / locality | Ama |
| Taluk / tehsil | Bhanpur |
| District | Basti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07234 |
Where it is
Ama, Bhanpur, Basti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 8.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 10.7 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — lapsed, 11.1 km away
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested, 11.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail… — under forest review, 11.7 km away
- Ordinary Soil Mining Project — environmental approval granted, 11.7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 12.1 km away
- Proposed Forest Land to be Diverted for Approach Access to HPCL Retail Outlet… — in-principle approval, conditions pending, 13 km away
All 26 Central Public Works Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.