Railway Siding from Lusa Railway Station to Mirzapur TPP Project Site by Adani Power Ltd is a proposed railway project in Dewari, Mirzapur, Uttar Pradesh. The site covers 1,691.2 acres.
Who is building it?
The applicant is Adani Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Dewari, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹600 crore; a site of 1,691.2 acres and 92 acres (37.2 ha) of forest land.
When was it filed?
The application was filed on 25 Sept 2026.
Project details
| Official title | Construction of Railway Siding from Lusa Railway Station to Mirzapur TPP Project Site at Sadar Tehsil, Mirzapur District, UP by Adani Power Ltd. |
|---|---|
| Status | More information requested |
| Status since | 4 Nov 2026 |
| Application filed | 25 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Adani Power Limited |
| Land area | 1,691.2 acres (684.4 ha) |
| Forest land | 92 acres (37.2 ha) |
| Project cost | ₹600 crore |
| Village / locality | Dewari |
| Taluk / tehsil | Mirzapur |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06296 |
In context
13 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dewari, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed "Building Stone Sand Stone" Project at Gata No.- 188/1, Village-… — environmental approval granted, 4.3 km away
- Proposed "Building Stone Sand Stone" Project at Gata No.- 188/1, Village-… — cleared for impact study, 4.3 km away
- Building Stone (Sandstone Khanda, Boulder, Gitti) Mining Project — environmental approval granted, 4.3 km away
- Building Stone (Sandstone Khanda, Boulder, Gitti) Mining Project — cleared for impact study, 4.3 km away
- Sand Stone Quartizite Ballast Gitti Mininig Project of Village - Lahaura,… — environmental approval granted, 4.4 km away
- Sandstone/Quartzite Ballast Gitti at Gata No.- 188 MI, Village- Lahaura,… — environmental approval granted, 4.4 km away
- Sandstone/Quartzite Ballast Gitti at Gata No.- 188 MI, Village- Lahaura,… — cleared for impact study, 4.4 km away
- Proposed Project of Building Stone-Sandstone Mine at Gata No 188/1, area 1.01 ha — lapsed, 4.4 km away
More from Adani Power Limited in Mirzapur
- Expansion of Mirzapur Thermal Power Plant from 1600 (2x800) MW (Phase I) to… — more information requested
- Residential Township of Mirzapur Thermal Power Plant — initial checks
- Transfer of Environmental Clearance (Change in Name) subsequently to NCLT… — environmental approval granted
- Water Intake Facilities including underground Water Pipeline and Associate… — more information requested
- Request for Name Change of User Agency from Welspun Energy UP Private Limited… — in-principle approval, conditions pending
- Laying of proposed 33 kV Transmission Line from 132/33kV Gurudev Nagar SS to… — in-principle approval, conditions pending