Quick answers
What is Laying of MDPE Gas Pipe Line (125mm)?
Laying of MDPE Gas Pipe Line (125mm) is a lapsed road project in Mahuli, Kanpur, Kanpur Nagar, Uttar Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Indraprastha Gas Limited New Delhi.
Has it been approved?
No. The application was lapsed on 20 May 2026, so it is no longer under consideration.
Where is it?
In Mahuli, Kanpur, Kanpur Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹90 lakh; a site of 0 acres and 240 m² of forest land.
When was it filed?
The application was filed on 12 Apr 2026.
Project details
| Official title | Laying of MDPE Gas Pipe Line (125mm) along with road on NH-19 from 506.100 to 507.300 (LHS) Total Km. 1.2 & 0.024Ha. In Forest Division/ Social Forestry Division Kanpur Nagar, District-Kanpur Nagar (UP) |
|---|---|
| Status | Lapsed |
| Status since | 20 May 2026 |
| Application filed | 12 Apr 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Indraprastha Gas Limited New Delhi |
| Land area | 200 m² |
| Forest land | 240 m² |
| Project cost | ₹90 lakh |
| Village / locality | Mahuli |
| Taluk / tehsil | Kanpur |
| District | Kanpur Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06378 |
In context
10 applications in Kanpur Nagar since January 2022 are in the same category (Roads & highways): 3 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mahuli, Kanpur, Kanpur Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 200 m away
- 2030 Prisons Capacity New District Jail Kanpur Nagar — under environmental review, 11 km away
- Laying of 125 mm MDPE CNG/ PNG pipeline using HDD method by Indraprastha Gas… — forest land use approved, 12 km away
- Proposed Widening & Strengthening From Narwal Modh at the Prayagraj Highway… — more information requested, 14.6 km away
- Laying of 24 F OF cable from Mall Road Telephone Exchange Kanpur to Fatehpur… — lapsed, 15.2 km away
- "Development of Economic Corridors, Inter Corridors and Feeder Routes to… — cleared for impact study, 30.2 km away
- "group Housing Project " by J P Realtor P LTD — environmental approval granted, 31 km away
- Protected Forest Land Proposed to Be Diverted for the Preparation of Detailed… — under forest review, 32.5 km away
More from Indraprastha Gas Limited New Delhi in Kanpur Nagar
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
4 Indraprastha Gas Limited projects in Kanpur Nagar
All 35 Indraprastha Gas Limited projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.