Quick answers
What is this project?
"Development of Economic Corridors, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana LOT-4/Package-2 (Kanpur Kabrai Project) is a proposed road project in Satharauli, Ghatampur, Kanpur Nagar, Uttar Pradesh.
Who is building it?
The applicant is National Highways Authority of India (NHAI).
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 1 Sept 2023), as of 27 Nov 2026.
Where is it?
In Satharauli, Ghatampur, Kanpur Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3 lakh.
When was it filed?
The application was filed on 23 Jun 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 1 Sept 2023 |
| Application filed | 23 Jun 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | National Highways Authority of India (NHAI) |
| Project cost | ₹3 lakh |
| Village / locality | Satharauli |
| Taluk / tehsil | Ghatampur |
| District | Kanpur Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00488 |
In context
10 applications in Kanpur Nagar since January 2022 are in the same category (Roads & highways): 3 approved, 4 filed or under review, and 3 withdrawn, lapsed or rejected.
Where it is
Satharauli, Ghatampur, Kanpur Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Widening & Strengthening From Narwal Modh at the Prayagraj Highway… — more information requested, 19.9 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 21.6 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 21.6 km away
- (3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project — returned to applicant, 21.9 km away
- (3x660 MW) Neyveli Uttar Pradesh Power Limited, Ghatampur Thermal Power Project — lapsed, 22.1 km away
- Proposed Hectare Reserve Forest Land To Be Diverted To Uttar Pradesh Power… — more information requested, 22.4 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 23.3 km away
- "Ordinary Sand Mine" from Riverbed of Yamuna River — environmental approval granted, 24 km away
More from National Highways Authority of India (NHAI) in Kanpur Nagar
- "Development of Economic Corridors, Inter Corridors and Feeder Routes to… — cleared for impact study
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.