Project details
| Official title | Proposed Forest Land to be diverted for Entry Road Elevation Work in District: Moradabad. |
|---|---|
| Status | Lapsed |
| Status since | 23 Jul 2026 |
| Application filed | 27 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Moradabad Development Authority |
| Land area | 17 acres (6.9 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹2.5 crore |
| Village / locality | Mangupura |
| Taluk / tehsil | Moradabad |
| District | Moradabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06414 |
In context
9 applications in Moradabad since January 2022 are in the same category (Roads & highways): 1 approved, 2 filed or under review, and 6 withdrawn, lapsed or rejected.
18 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mangupura, Moradabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to… — more information requested, 100 m away
- Mustajab Husain — lapsed, 150 m away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 400 m away
- Protected Forest Land to be diverted for Construction of Nala at… — initial checks, 500 m away
- Proposed Protected Forest Land to be diverted for approach access to Shri… — lapsed, 550 m away
- Environmental Clearance of Proposed Township and area development Govindpuram… — under environmental review, 600 m away
- Protected Forest Land to be diverted for Construction of Commercial and… — forest land use approved, 850 m away
- Proposed Forest land to be Diverted for Entry/Exit Approach to Hotel of… — forest land use approved, 1 km away
More from Moradabad Development Authority in Moradabad
- Protected Forest Land to be diverted for Construction of Nala at… — initial checks
- Proposed Township and area development Sahyadri Residential Scheme Pocket -A — under environmental review
- Environmental Clearance of Proposed Township and area development Govindpuram… — under environmental review
All 4 Moradabad Development Authority projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.