One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Protected Forest Land to be Diverted for Laying of Drinking Water Pipeline…
Project details
| Official title | Proposed Protected Forest Land to be Diverted for Laying of Drinking Water Pipeline along Village Road of Sighara Urf Tatarganj Under Drinking Water Scheme of Jal Jeeval Mission of Govt. OF India, in District:- Pilibhit |
|---|---|
| Status | Lapsed |
| Status since | 7 Feb 2025 |
| Application filed | 24 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Manish Gangwar |
| Land area | 5.4 acres (2.2 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹3.1 crore |
| Village / locality | Singhara Tatarganj |
| Taluk / tehsil | Puranpur |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06456 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Jun 2024 (this page) | Lapsed | 5.4 acres | ₹3.1 crore |
| New project filed 29 May 2024 | Under wildlife review | 5.4 acres | ₹3.1 crore |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Singhara Tatarganj, Puranpur, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Laying of Drinking Water… — under wildlife review, 0 m away
- Forest Land Proposed to be diverted for construction of Road from Sashasra… — lapsed, 750 m away
- Jal Jeevan Mission Phase III Pilibhit, Bareilly Division — lapsed, 1.4 km away
- 4G Saturation Project — lapsed, 6.4 km away
- 4G Saturation Project — application filed, 6.4 km away
- Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under… — in-principle approval, conditions pending, 8.9 km away
- Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under… — under wildlife review, 8.9 km away
- 4G Saturation Project — lapsed, 11.4 km away
More from Manish Gangwar in Pilibhit
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.