One of 2 filings for this project. The project's main page, with every filing and where each stands: Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under "Govt. of…
Project details
| Official title | Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under "Govt. of India 4G Saturation Project" at SSB BoP in District philibhit (UP) (UP West Circle) |
|---|---|
| Status | Under wildlife review |
| Status since | 24 Jan 2024 |
| Application filed | 24 Jan 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 400 m² |
| Project cost | ₹2.3 crore |
| Village / locality | Rf |
| Taluk / tehsil | Puranpur |
| District | Pilibhit |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07328 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 20 Feb 2025 | In-principle approval, conditions pending | 0.1 acres | ₹2.3 crore |
| New project filed 24 Jan 2024 (this page) | Under wildlife review | 0.1 acres | ₹2.3 crore |
In context
7 applications in Pilibhit since January 2022 are in the same category (Telecom): 0 approved, 6 filed or under review, and 1 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rf, Puranpur, Pilibhit, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Rediversion of Forest Land for Installation of 4G BSNL Mobile Towers under… — in-principle approval, conditions pending, 0 m away
- 4G Saturation Project — lapsed, 2.6 km away
- 4G Saturation Project — application filed, 2.6 km away
- 4G Saturation Project — lapsed, 2.6 km away
- 4G Saturation Project — application filed, 2.6 km away
- 4G Saturation Project — lapsed, 4.7 km away
- 4G Saturation Project — application filed, 4.7 km away
- Project for Laying of Proposed Underground Optical Fiber Cable (OFC) — under forest review, 5 km away
More from Mahesh Nair in Pilibhit
- 4G Saturation Project — lapsed
- 4G Saturation Project — lapsed
- 4G Saturation Project — lapsed
- 4G Saturation Project — application filed
- 4G Saturation Project — application filed
- 4G Saturation Project — application filed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.