Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Rajapur, Tehsil:- Biswan, District:- Sitapur. |
|---|---|
| Status | Forest land use approved |
| Status since | 27 Feb 2026 |
| Application filed | 9 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,300 m² |
| Forest land | 2,060 m² |
| Project cost | ₹55 lakh |
| Village / locality | Rajapur |
| Taluk / tehsil | Biswan |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06465 |
In context
31 applications in Sitapur since January 2022 are in the same category (Fuel stations): 24 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.8 acres, this one is smaller than 74% of them.
Where it is
Rajapur, Biswan, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Reliance BP Mobility Limited Retail Outlet on Bahraich to Sitapur… — forest land use approved, 6 km away
- Proposed Protected Forest Land to be diverted for Construction of 02 Lane… — lapsed, 7.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 7.6 km away
- Ordinary Earth Mining Project — environmental approval granted, 7.9 km away
- Mining of Minor Mineral Ordinary Soil — environmental approval granted, 8.3 km away
- Expansion of Existing Sugar Unit From 8500 Tcd to 12000 Tcd Without Change in… — cleared for impact study, 9.3 km away
- Expansion of Existing Sugar Unit From 8500 Tcd to 12000 Tcd Without Change in… — environmental approval granted, 9.3 km away
- No Increase in Pollution Load for Operation of Existing Distillery on C Heavy… — initial checks, 9.4 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Sitapur
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — in-principle approval, conditions pending
- Sitapur-district Sitapur State Uttar pradesh. — lapsed
- Sitapur state- Uttar Pradesh — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to BPCL Retail… — forest land use approved
12 Bharat Petroleum Corporation (BPCL) projects in Sitapur
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.