Project details
| Official title | Proposed Protected Forest Land to be diverted for Construction of 02 Lane Railway Over Bridge on Railway Sampar No. 13-Special at Rail Km No. 22/27-29 of Harauni-Jaintipur Rail Section on Bani-Mohan Road, in District :- Lucknow. |
|---|---|
| Status | Forest land use approved |
| Status since | 25 Oct 2024 |
| Application filed | 30 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bridge Construction Unit III Lucknow |
| Land area | 1.2 acres (0.5 ha) |
| Forest land | 1.1 acres (0.4 ha) |
| Project cost | ₹40.9 crore |
| Village / locality | Harauni |
| Taluk / tehsil | Sadar |
| District | Lucknow |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06516 |
In context
19 applications in Lucknow since January 2022 are in the same category (Roads & highways): 4 approved, 5 filed or under review, and 10 withdrawn, lapsed or rejected. At 1.2 acres, this one is smaller than 89% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harauni, Sadar, Lucknow, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Industrial Shed for Manufacturing from 1500 MTPA to 6000 MTPA… — environmental approval granted, 2.5 km away
- "UP DEFENCE INDUSTRIAL CORRIDOR" — environmental approval granted, 2.9 km away
- Ordinary Earth Mining Project at Gata No. – 619 Mi & 619 Sann — environmental approval granted, 4.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 4.5 km away
- Ordinary Soil Mining — environmental approval granted, 5.4 km away
- Reciprocal Warehousing — environmental approval granted, 5.6 km away
- Ordinary Soil Mine — initial checks, 7.1 km away
- U.P. Special Security Force Head and 1st Battalion U.P. Special Security Force — environmental approval granted, 9.3 km away
More from Bridge Construction Unit III Lucknow in Lucknow
- Proposed Forest Land to be Diverted for Construction of Flyover — more information requested
All 13 Bridge Construction Unit projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.