What is Developing? Open the mapMap

Forest land use approvedFuel stations · Sitapur, Uttar Pradesh

Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet

Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Parsauli, Misrikh, Sitapur, Uttar Pradesh. The site covers 0.9 acres. Its stated project cost is ₹55 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 27 Jan 2026).

See it on the live map All projects in Sitapur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Project details

Official titleProposed forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet at Village:- Parsauli, Tehsil:- Misrikh, District:- Sitapur (Uttar Pradesh).
StatusForest land use approved
Status since27 Jan 2026
Application filed2 Jul 2025
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantIndian Oil Corporation Limited (IOCL)
Land area3,500 m²
Forest land1,940 m²
Project cost₹55 lakh
Village / localityParsauli
Taluk / tehsilMisrikh
DistrictSitapur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06540

In context

31 applications in Sitapur since January 2022 are in the same category (Fuel stations): 24 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.9 acres, this one is smaller than 55% of them.

1 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Parsauli, Misrikh, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Indian Oil Corporation Limited (IOCL) in Sitapur

16 Indian Oil Corporation (IOCL) projects in Sitapur
All 822 Indian Oil Corporation (IOCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.