Quick answers
What is this project?
Protected Forest Land proposed for diversion for Entry/Exit approach to Indian Oil Corporation Limited Retail Outlet on NH-19 (Old NH-2) in Km. 531-532 Ch. 531.171 (RHS) at Gata No. 574 & 574Kha, Village: Itraura Pilkhini, Tehsil-Bindki, District: Fatehpur (Uttar Pradesh) is an approved fuel station in Itawra Pilkhini, Bindki, Fatehpur, Uttar Pradesh. The site covers 1.3 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 25 Apr 2026), as of 27 Nov 2026.
Where is it?
In Itawra Pilkhini, Bindki, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh; a site of 1.3 acres and 2,630 m² of forest land.
When was it filed?
The application was filed on 7 Dec 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 25 Apr 2026 |
| Application filed | 7 Dec 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 1.3 acres (0.5 ha) |
| Forest land | 2,630 m² |
| Project cost | ₹45 lakh |
| Village / locality | Itawra Pilkhini |
| Taluk / tehsil | Bindki |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06678 |
In context
50 applications in Fatehpur since January 2022 are in the same category (Fuel stations): 38 approved, 6 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 1.3 acres, this one is larger than 80% of them.
Where it is
Itawra Pilkhini, Bindki, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Steel Melting Shop (Induction Furnace 4X30 Ton, LRF and CCM) and TMT… — environmental approval granted, 5.3 km away
- Proposed Steel Melting Shop (Induction Furnace 4X30 Ton, LRF and CCM) and TMT… — cleared for impact study, 5.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — more information requested, 5.8 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach of… — lapsed, 5.8 km away
- Laying of MDPE Gas Pipe Line (125mm) — lapsed, 8 km away
- Ordinary Soil Excavation Project — environmental approval granted, 8.3 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 8.7 km away
- Proposed Lilo of Both Ckts of 765KV Varanasi - Kanpur (Gis) D/C Line at… — in-principle approval, conditions pending, 9.6 km away
More from Indian Oil Corporation Limited (IOCL) in Fatehpur
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved
13 Indian Oil Corporation (IOCL) projects in Fatehpur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.