Quick answers
What is Jal Jivan Mission?
Jal Jivan Mission is a lapsed water and irrigation project in Godhna, Utraula, Balrampur, Uttar Pradesh. It seeks 0.4 acres of forest land.
Who is building it?
The applicant is Dara Engineering & Infrastructures Private Limited.
Has it been approved?
No. The application was lapsed on 28 Oct 2026, so it is no longer under consideration.
Where is it?
In Godhna, Utraula, Balrampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 crore and 1,600 m² of forest land.
When was it filed?
The application was filed on 8 Jul 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 28 Oct 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Water & irrigation |
| Applicant | Dara Engineering & Infrastructures Private Limited |
| Forest land | 1,600 m² |
| Project cost | ₹2 crore |
| Village / locality | Godhna |
| Taluk / tehsil | Utraula |
| District | Balrampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06670 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Godhna, Utraula, Balrampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Iocl… — forest land use approved, 3.7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 4.3 km away
- Proposed Common Biomedical Waste Treatment Facility (CBWTF) by M/s Rajveer… — environmental approval granted, 7.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 7.3 km away
- Proposed Forest Land to Be Diverted for Entry/Exit Approach to Iocl Retail… — forest land use approved, 7.9 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 8.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 9.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 9.7 km away
All 13 Dara Engineering & projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.