What is Developing? Open the mapMap

Forest land use approvedFuel stations · Balrampur, Uttar Pradesh

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Kapuwa Sherpur, Utraula, Balrampur, Uttar Pradesh. The site covers 0.8 acres. Its stated project cost is ₹60 lakh. As of 27 Nov 2026, its status is “Forest land use approved” (since 17 Mar 2026).

See it on the live map All projects in Balrampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Kapuwa Sherpur, Utraula, Balrampur, Uttar Pradesh. The site covers 0.8 acres.

Who is building it?

The applicant is Bharat Petroleum Corporation Limited (BPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 17 Mar 2026), as of 27 Nov 2026.

Where is it?

In Kapuwa Sherpur, Utraula, Balrampur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹60 lakh; a site of 0.8 acres and 1,860 m² of forest land.

When was it filed?

The application was filed on 29 Dec 2024.

Project details

Official titleProposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Kapauwa Sherpur, Tehsil:-Utraula, District:- Balrampur.
StatusForest land use approved
Status since17 Mar 2026
Application filed29 Dec 2024
Approval soughtForest land use
Application typeNew project
SectorFuel stations
ApplicantBharat Petroleum Corporation Limited (BPCL)
Land area3,100 m²
Forest land1,860 m²
Project cost₹60 lakh
Village / localityKapuwa Sherpur
Taluk / tehsilUtraula
DistrictBalrampur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06022

In context

16 applications in Balrampur since January 2022 are in the same category (Fuel stations): 13 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.8 acres, this one is smaller than 69% of them.

3 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kapuwa Sherpur, Utraula, Balrampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharat Petroleum Corporation Limited (BPCL) in Balrampur

5 Bharat Petroleum Corporation (BPCL) projects in Balrampur
All 656 Bharat Petroleum Corporation (BPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.