Quick answers
What is this project?
Proposed Forest land to be diverted for Construction of 220 KV Fatehpur – Khaga line at 765 KV S/S Fatehpur is a lapsed power project in Faijullapur, Fatehpur, Uttar Pradesh. The site covers 208 acres.
Who is building it?
The applicant is Jewar Transmission Limited.
Has it been approved?
No. The application was lapsed on 18 Jul 2026, so it is no longer under consideration.
Where is it?
In Faijullapur, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹170 crore; a site of 208 acres and 1.9 acres (0.8 ha) of forest land.
When was it filed?
The application was filed on 11 Jun 2026.
Project details
| Official title | Proposed Forest land to be diverted for Construction of 220 KV Fatehpur – Khaga line at 765 KV S/S Fatehpur, in District: -Fatehpur (UP). |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2026 |
| Application filed | 11 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Jewar Transmission Limited |
| Land area | 208 acres (84.2 ha) |
| Forest land | 1.9 acres (0.8 ha) |
| Project cost | ₹170 crore |
| Village / locality | Faijullapur |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06703 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Faijullapur, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved, 1.5 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 1.7 km away
- Re-diversion for Reliance 4G Project for Laying of OFC — lapsed, 3.4 km away
- Re-diversion for Reliance4G Project for Laying of OFC alongwith… — forest land use approved, 3.4 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — lapsed, 5.3 km away
- Laying of CS Gas Pipe Line (200mm) — forest land use approved, 6 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 6 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 7.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.