Quick answers
What is Project for Laying of Carbon Steel Gas Pipe Line (200mm)?
Project for Laying of Carbon Steel Gas Pipe Line (200mm) is a lapsed pipeline project in Bastapur, Fatehpur, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is Indraprastha Gas Limited New Delhi.
Has it been approved?
No. The application was lapsed on 30 Dec 2025, so it is no longer under consideration.
Where is it?
In Bastapur, Fatehpur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹86 lakh; a site of 1.4 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 8 Oct 2024.
Project details
| Official title | Project for Laying of Carbon Steel Gas Pipe Line (200mm) along with road on Lalganj-Fatehpur Marg (NH-335) From Km. 200.800 to Km. 211.800 on LHS & Kanpur-Prayagraj Marg (NH-19) from Km. 552.000 to Km. 559.400 (On L.H.S.), Total Km. 18.4 & 0.5520 Ha. In Forest Division/ Social Forestry Division Fatehpur, District-Fatehpur (UP). |
|---|---|
| Status | Lapsed |
| Status since | 30 Dec 2025 |
| Application filed | 8 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indraprastha Gas Limited New Delhi |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Bastapur |
| Taluk / tehsil | Fatehpur |
| District | Fatehpur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05214 |
In context
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bastapur, Fatehpur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — forest land use approved, 2.4 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved, 2.5 km away
- Laying of CS Gas Pipe Line (200mm) — forest land use approved, 3.6 km away
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — lapsed, 3.6 km away
- Common Bio Medical Waste Treatment Facility (CBWTF) M/s Gopal Complex Fatehpur — under environmental review, 3.7 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved, 4.1 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 4.8 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — forest land use approved, 5 km away
More from Indraprastha Gas Limited New Delhi in Fatehpur
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved
- Laying of MDPE Gas Pipe Line (125mm) — lapsed
- Laying of MDPE Gas Pipe Line (125mm) — lapsed
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — forest land use approved
- Laying of CS Gas Pipe Line (200mm) — forest land use approved
- Project for Laying of Carbon Steel Gas Pipe Line (200mm) — forest land use approved
8 Indraprastha Gas Limited projects in Fatehpur
All 35 Indraprastha Gas Limited projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.