Quick answers
What is this project?
Proposed Protected Forest Land to Be Diverted in Favour of Public Work Department for Widening and Strengthening (2 Lane With Paved Shoulder) of Firozabad-Fatehabad-Saiyan-Khairagarh-Achhnera-Bharatpur Road (SH-143) From Km 94.206 to 98.856 & 100.956 to 107.606 Total Length 11.300 Km is a lapsed road project in Achhnera, Kiraoli, Agra, Uttar Pradesh. The site covers 16.8 acres.
Who is building it?
The applicant is Public Works Department.
Has it been approved?
No. The application was lapsed on 18 Jun 2026, so it is no longer under consideration.
Where is it?
In Achhnera, Kiraoli, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹22 crore; a site of 16.8 acres and 16.8 acres (6.8 ha) of forest land.
When was it filed?
The application was filed on 17 Sept 2025.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Protected Forest Land to Be Diverted in Favour of Public Work Department for…
Project details
| Official title | Proposed Protected Forest Land to Be Diverted in Favour of Public Work Department for Widening and Strengthening (2 Lane With Paved Shoulder) of Firozabad-Fatehabad-Saiyan-Khairagarh-Achhnera-Bharatpur Road (SH-143) From Km 94.206 to 98.856 & 100.956 to 107.606 Total Length 11.300 Km in District Agra (Up) |
|---|---|
| Status | Lapsed |
| Status since | 18 Jun 2026 |
| Application filed | 17 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Public Works Department |
| Land area | 16.8 acres (6.8 ha) |
| Forest land | 16.8 acres (6.8 ha) |
| Project cost | ₹22 crore |
| Village / locality | Achhnera |
| Taluk / tehsil | Kiraoli |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06713 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 13 Jul 2026 | Lapsed | 2.8 acres | ₹22 crore |
| New project filed 17 Sept 2025 (this page) | Lapsed | 16.8 acres | ₹22 crore |
In context
17 applications in Agra since January 2022 are in the same category (Roads & highways): 2 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. At 16.8 acres, this one is larger than 94% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Achhnera, Kiraoli, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to Be Diverted in Favour of Public Work… — lapsed, 250 m away
- The Diversion of Road Side Protected Forest Land for Laying Water Supply Pipe… — forest land use approved, 550 m away
- Protected Forest Land proposed for diversion for Entry/Exit approach to… — more information requested, 3.4 km away
- Proposed Kachora Soil Mining Project of M/s Balaji Construction Company… — under environmental review, 5.1 km away
- The Diversion of Road Side Protected Forest Land on Agra-Jaipur Road (New… — lapsed, 5.3 km away
- The Diversion of Road Side Protected Forest Land on Agra-Jaipur Road (New… — lapsed, 5.3 km away
- Diversion of 0.0940 Hectare of Protected Forest land Under Social Forestry… — forest land use approved, 5.3 km away
- The Diversion of Road Side Protected Forest Land(0.15850 Hac.) on Agra-Jaipur… — forest land use approved, 5.5 km away
All 43 Public Works Department, Uttar Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.