Quick answers
What is this project?
The Diversion of Road Side Protected Forest Land on Agra-Jaipur Road (New NH-21) , Rhs, Km Stone No-26, Ch. 25.923 by GAIL is a lapsed building project in Bidyapur, Kiraoli, Agra, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is GAIL (India) Limited (GAIL).
Has it been approved?
No. The application was lapsed on 24 Jun 2026, so it is no longer under consideration.
Where is it?
In Bidyapur, Kiraoli, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹85 lakh; a site of 0.9 acres and 1,090 m² of forest land.
When was it filed?
The application was filed on 3 May 2024.
Project details
| Official title | Proposal for the Diversion of Road Side Protected Forest Land on Agra-Jaipur Road (New NH-21) , Rhs, Km Stone No-26, Ch. 25.923, at Gata No.- 40 Village- Vidhyapur , Tehsil- Kiraoli & Distt. Agra , for the Construction of Approach Access to Proposed Gail Gas LTD Cng Station . |
|---|---|
| Status | Lapsed |
| Status since | 24 Jun 2026 |
| Application filed | 3 May 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | GAIL (India) Limited (GAIL) |
| Land area | 3,700 m² |
| Forest land | 1,090 m² |
| Project cost | ₹85 lakh |
| Village / locality | Bidyapur |
| Taluk / tehsil | Kiraoli |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05498 |
In context
39 applications in Agra since January 2022 are in the same category (Buildings & townships): 16 approved, 16 filed or under review, and 7 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.9 acres, this one is smaller than 92% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bidyapur, Kiraoli, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The Diversion of Road Side Protected Forest Land on Agra-Jaipur Road (New… — lapsed, 100 m away
- Diversion of 0.0940 Hectare of Protected Forest land Under Social Forestry… — forest land use approved, 200 m away
- The Diversion of Road Side Protected Forest Land(0.15850 Hac.) on Agra-Jaipur… — forest land use approved, 450 m away
- Proposed Protected Forest Land to Be Diverted in Favour of Public Work… — lapsed, 5.3 km away
- The Diversion of Road Side Protected Forest Land for Laying Water Supply Pipe… — forest land use approved, 5.3 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 5.5 km away
- Proposed Protected Forest Land to Be Diverted in Favour of Public Work… — lapsed, 5.6 km away
- The Diversion of Road Side Protected Forest Land (0.1239 Hac.) on Agra-Jaipur… — forest land use approved, 5.6 km away
More from GAIL (India) Limited (GAIL) in Agra
All 86 GAIL (India) (GAIL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.