Quick answers
What is this project?
Proposed Protected Forest land to be diverted for Entry/Exit approach to Temporary Establishment for 19 Years of Nayara Energy Limited Retail Outlet is a lapsed fuel station in Bhagwanpur Khadar, Hasanpur, Amroha, Uttar Pradesh. The site covers 1.4 acres.
Who is building it?
The applicant is M/S Nayara Energy Limited.
Has it been approved?
No. The application was lapsed on 17 Jun 2024, so it is no longer under consideration.
Where is it?
In Bhagwanpur Khadar, Hasanpur, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹70 lakh; a site of 1.4 acres and 3,000 m² of forest land.
When was it filed?
The application was filed on 18 Mar 2024.
Project details
| Official title | Proposed Protected Forest land to be diverted for Entry/Exit approach to Temporary Establishment for 19 Years of Nayara Energy Limited Retail Outlet at Village: -Bhagwanpur Khadar, Tehsil: - Hasanpur, District:- Amroha |
|---|---|
| Status | Lapsed |
| Status since | 17 Jun 2024 |
| Application filed | 18 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 1.4 acres (0.6 ha) |
| Forest land | 3,000 m² |
| Project cost | ₹70 lakh |
| Village / locality | Bhagwanpur Khadar |
| Taluk / tehsil | Hasanpur |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06745 |
In context
30 applications in Amroha since January 2022 are in the same category (Fuel stations): 20 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1.4 acres, this one is larger than 90% of them.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhagwanpur Khadar, Hasanpur, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — lapsed, 800 m away
- NOC Wildlife Clearance of Protected Forest Land Proposed For Diversion For… — more information requested, 800 m away
- Industrial Shed at A8, Gajraula II Industrial Area, UPSIDA, Tehsil – Dhanaura,… — environmental approval granted, 4.1 km away
- Industrial Shed at A8, Gajraula II Industrial Area, UPSIDA, Tehsil – Dhanaura,… — more information requested, 4.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — more information requested, 4.2 km away
- Proposed for NOC/Wildlife Clearence of Entry/Exit approach to IOCL Retail Outlet — more information requested, 4.2 km away
- Proposed IOCL Retail Outlet at Zero Point NH-9 to Dayawali Village Road,… — under wildlife review, 4.4 km away
- Proposed Active Pharmaceutical Ingredient & API Chemical Intermediates… — cleared for impact study, 5 km away
More from M/S Nayara Energy Limited in Amroha
- Proposed Protected Forest land to be diverted for Entry/Exit approach to… — forest land use approved
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.