Quick answers
What is this project?
Proposed Protected Forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet is an approved fuel station in Hariyana, Amroha, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is M/S Nayara Energy Limited.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Dec 2025), as of 27 Nov 2026.
Where is it?
In Hariyana, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1 acre and 2,190 m² of forest land.
When was it filed?
The application was filed on 31 Aug 2024.
Project details
| Official title | Proposed Protected Forest land to be diverted for Entry/Exit approach to Nayara Energy Limited Retail Outlet at Village: -Haryana, Tehsil:- Amroha, District:- Amroha. |
|---|---|
| Status | Forest land use approved |
| Status since | 19 Dec 2025 |
| Application filed | 31 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 3,900 m² |
| Forest land | 2,190 m² |
| Project cost | ₹60 lakh |
| Village / locality | Hariyana |
| Taluk / tehsil | Amroha |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06629 |
In context
30 applications in Amroha since January 2022 are in the same category (Fuel stations): 20 approved, 6 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 1 acre, this one is larger than 67% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hariyana, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 300 m away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 600 m away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 650 m away
- Proposed IOCL Retail Outlet at Delhi-Moradabad Road NH-09 (Old NH-24) KM-134… — lapsed, 2.4 km away
- Ordinary Soil Mine — under environmental review, 3.2 km away
- Police Line (Residential & Non-Residential) Project by M/s SUPERINTENDENT OF… — more information requested, 3.5 km away
- Police Line (Residential & Non-Residential) Project by M/s SUPERINTENDENT OF… — lapsed, 3.5 km away
- Granting of permission for Construction of Access to the Proposed CNG Station… — forest land use approved, 4.1 km away
More from M/S Nayara Energy Limited in Amroha
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.