Quick answers
What is 4G Saturation Project?
4G Saturation Project is a lapsed project in Raiwana Dallipur, 0, Amroha, Uttar Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Raiwana Dallipur, 0, Amroha, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.3 crore and a site of 0 acres.
When was it filed?
The application was filed on 23 Feb 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: 4G Saturation Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 23 Feb 2023 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Project cost | ₹1.3 crore |
| Village / locality | Raiwana Dallipur |
| Taluk / tehsil | 0 |
| District | Amroha |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06855 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 23 Feb 2023 (this page) | Lapsed | 0 acres | ₹1.3 crore |
| New project filed 21 Nov 2022 | More information requested | 0 acres | ₹1.3 crore |
Where it is
Raiwana Dallipur, 0, Amroha, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 4G Saturation Project — more information requested, 0 m away
- Private Land Proposed for Establishment of Sugar Crusher Plant — more information requested, 8.2 km away
- Protected Land comes under State WildLife Barasingha Sanctuary for… — under wildlife review, 15.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to M/S… — lapsed, 15.9 km away
- New Retail Outlet of Bpcl Meerut, Forest Land Is Required to Be Diverted As… — forest land use approved, 16 km away
- Proposed Protected Forest Land To Be Diverted To Provincial Division Public… — under forest review, 16.4 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Megha… — forest land use approved, 17 km away
- Expansion in Existing Pesticide Manufacturing Unit "Without increase in… — initial checks, 18.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.