Quick answers
What is this project?
Proposed protected forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet is an approved fuel station in Ratanpur Jhingha, Tulsipur, Balrampur, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Jan 2026), as of 27 Nov 2026.
Where is it?
In Ratanpur Jhingha, Tulsipur, Balrampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹50 lakh; a site of 0.5 acres and 1,620 m² of forest land.
When was it filed?
The application was filed on 19 Jun 2024.
Project details
| Official title | Proposed protected forest land to be diverted for Entry/Exit approach to IOCL Retail Outlet at Village:-Majra Balapur (Revenue Village:-Ratanpur Jhingaha), Tehsil:-Tulsipur, District:-Balrampur |
|---|---|
| Status | Forest land use approved |
| Status since | 27 Jan 2026 |
| Application filed | 19 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 2,000 m² |
| Forest land | 1,620 m² |
| Project cost | ₹50 lakh |
| Village / locality | Ratanpur Jhingha |
| Taluk / tehsil | Tulsipur |
| District | Balrampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06881 |
In context
16 applications in Balrampur since January 2022 are in the same category (Fuel stations): 13 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.5 acres, this one is smaller than 100% of them.
Where it is
Ratanpur Jhingha, Tulsipur, Balrampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- OFC laying for 20Mbps LL & 100Mbps ILL at Koyla Baas Chowki 9th BN SSB Balrampur — lapsed, 5.2 km away
- Linear Project : Laying an electricity line at trade and transit route from… — more information requested, 6.1 km away
- Project for Laying of Optical Fiber Cable (OFC) — lapsed, 6.3 km away
- Proposed Forest Land to be diverted for Construction of Entrance Gate under… — forest land use approved, 8.3 km away
- Proposed Maintenance work on already diverted reserved forest land for… — lapsed, 8.4 km away
- Linear Project : Laying an electricity line at trade and transit route from… — more information requested, 8.8 km away
- Tower Construction Under Bop Bip Project at Gurung Naka Bop Upe — lapsed, 9.8 km away
- Expansion of existing Sugar unit from 7000 TCD to 10000 TCD and expansion in… — environmental approval granted, 11.6 km away
More from Indian Oil Corporation Limited (IOCL) in Balrampur
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — under forest review
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — in-principle approval, conditions pending
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved
10 Indian Oil Corporation (IOCL) projects in Balrampur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.