Quick answers
What is this project?
Proposed for Reserved forest land of Umbrella Work: Northern Railway Protection Work at Bridge No. 1248 By Extension of Guide Bund and others Protection Works Betwween BLW-RAI in the section of ADEN-RK is a proposed railway project in Lalpur, Najibabad, Bijnor, Uttar Pradesh. The site covers 15.8 acres.
Who is building it?
The applicant is Ministry of Railway.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Lalpur, Najibabad, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹19.2 crore; a site of 15.8 acres and 12 acres (4.9 ha) of forest land.
When was it filed?
The application was filed on 20 Apr 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 10 Jun 2026 |
| Application filed | 20 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Ministry of Railway |
| Land area | 15.8 acres (6.4 ha) |
| Forest land | 12 acres (4.9 ha) |
| Project cost | ₹19.2 crore |
| Village / locality | Lalpur |
| Taluk / tehsil | Najibabad |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06940 |
Where it is
Lalpur, Najibabad, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 5.8 km away
- "no Increase in Pollution Load Certificate" for Proposed Addition of… — initial checks, 7 km away
- Common Bio-Medical Waste Treatment Facility by Vamika Bio Care Management at… — lapsed, 14 km away
- The Aim of This Work Is That to Provide Essential Electric Supply Nearby Shri… — forest land use approved, 14.5 km away
- Ordinary Soil Mine — under environmental review, 15.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 16.8 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to M/s… — more information requested, 20.4 km away
- NOC Wildlife Clearance of Proposed Non-Forest Land In State Animal Barasingha… — under wildlife review, 20.9 km away
All 149 Ministry of Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.