Quick answers
What is this project?
The Diversion of Road Side Protected Forest Land (0.1239 Hac.) on Agra-Jaipur Road Nh-11(New Hn-21), Km 21 (Ch 20.168.888) Rhs, Khasra No. 1122/4 Vill - Gopau,tehseel Kirawali ,dist-Agra ,for the Construction of Approach Road to Proposed Bpcl Fuel Station/ Petrol Pump by BPCL is an approved road project in Gopau, Kiraoli, Agra, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 25 Apr 2026), as of 27 Nov 2026.
Where is it?
In Gopau, Kiraoli, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 1 acre and 1,240 m² of forest land.
When was it filed?
The application was filed on 1 Dec 2022.
Project details
| Official title | Proposal for the Diversion of Road Side Protected Forest Land (0.1239 Hac.) on Agra-Jaipur Road Nh-11(New Hn-21), Km 21 (Ch 20.168.888) Rhs, Khasra No. 1122/4 Vill - Gopau,tehseel Kirawali ,dist-Agra ,for the Construction of Approach Road to Proposed Bpcl Fuel Station/ Petrol Pump |
|---|---|
| Status | Forest land use approved |
| Status since | 25 Apr 2026 |
| Application filed | 1 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1 acres (0.4 ha) |
| Forest land | 1,240 m² |
| Project cost | ₹65 lakh |
| Village / locality | Gopau |
| Taluk / tehsil | Kiraoli |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06957 |
In context
17 applications in Agra since January 2022 are in the same category (Roads & highways): 2 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. At 1 acre, this one is smaller than 87% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gopau, Kiraoli, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 50 m away
- Protected Forest Land to be Diverted for Entry/ Exist and middle approach to… — lapsed, 4.5 km away
- The Diversion of Road Side Protected Forest Land(0.15850 Hac.) on Agra-Jaipur… — forest land use approved, 5.1 km away
- The Diversion of Road Side Protected Forest Land on Agra-Jaipur Road (New… — lapsed, 5.6 km away
- The Diversion of Road Side Protected Forest Land on Agra-Jaipur Road (New… — lapsed, 5.7 km away
- Diversion of 0.0940 Hectare of Protected Forest land Under Social Forestry… — forest land use approved, 5.8 km away
- Amended Bharatnet — lapsed, 6.3 km away
- Proposed Kachora Soil Mining Project of M/s Balaji Construction Company… — under environmental review, 6.5 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Agra
- Proposal Under the Van (Sanrakshan Evam Samvardhan) Act, 1980 (As Amended in… — lapsed
- The Diversion of 0.0981 Hectares of Protected Forest Land Under Section-2 of… — forest land use approved
- Wildlife Clearance for the Development of a New Retail Outlet by BPCL — under wildlife review
- The Diversion of Road Side Protected Forest Land on Agra -Bah -Kachaura Ghat… — forest land use approved
- The Diversion of Road Side Protected Forest Land on Agra-Bharatpur Road(New… — forest land use approved
- Bpcl New Retail Outlet on Jaitpur Kalan- Nand Gawa- Pinahat- Tasod Road… — more information requested
15 Bharat Petroleum Corporation (BPCL) projects in Agra
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.