Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Bardehra Bharigaon, Ikauna, Shrawasti, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 21 Apr 2026), as of 27 Nov 2026.
Where is it?
In Bardehra Bharigaon, Ikauna, Shrawasti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 1 acre and 2,580 m² of forest land.
When was it filed?
The application was filed on 13 Jan 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Bardehra Bharigaon, Tehsil:- Jamunaha, District:- Shrawasti |
|---|---|
| Status | Forest land use approved |
| Status since | 21 Apr 2026 |
| Application filed | 13 Jan 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 1 acres (0.4 ha) |
| Forest land | 2,580 m² |
| Project cost | ₹55 lakh |
| Village / locality | Bardehra Bharigaon |
| Taluk / tehsil | Ikauna |
| District | Shrawasti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06988 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bardehra Bharigaon, Ikauna, Shrawasti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest land to be diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 2 km away
- CBWTF Facility ROYAL POLLUTION CONTROL SERVICES — cleared for impact study, 9.4 km away
- Removal of Sand on Agriculture Land — initial checks, 14 km away
- Project for Laying of Optical Fibre Cable (OFC) — under forest review, 20.8 km away
- Ordinary Sand removal from Bhumidhari/ Agricultural land/Private land at Gata… — lapsed, 21.4 km away
- Riverbed Ordinary Sand mining" Project at Gata No.-37Mi, Village–Kodari… — environmental approval granted, 21.7 km away
- Riverbed Ordinary Sand mining" Project at Gata No.-37Mi, Village–Kodari… — cleared for impact study, 21.7 km away
- High-Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-II)… — more information requested, 22.5 km away
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.