Quick answers
What is this project?
High-Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-II) Package-10, from design km 510+700 to km 579+950 in the state of Uttar Pradesh is a proposed road project in Salvariya, Ikauna, Shrawasti, Uttar Pradesh. It seeks 7.6 acres of forest land.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Salvariya, Ikauna, Shrawasti, Uttar Pradesh.
How big is it?
It has a stated cost of ₹42 crore and 7.6 acres (3.1 ha) of forest land.
When was it filed?
The application was filed on 9 Oct 2026.
Project details
| Official title | Development of High-Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-II) Package-10, from design km 510+700 to km 579+950 in the state of Uttar Pradesh |
|---|---|
| Status | More information requested |
| Status since | 14 Nov 2026 |
| Application filed | 9 Oct 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Forest land | 7.6 acres (3.1 ha) |
| Project cost | ₹42 crore |
| Village / locality | Salvariya |
| Taluk / tehsil | Ikauna |
| District | Shrawasti |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05084 |
Where it is
Salvariya, Ikauna, Shrawasti, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Sand removal from Bhumidhari/ Agricultural land/Private land at Gata… — lapsed, 19.4 km away
- "Bhutha Ordinary Sand Mine Riverbed of Rapti River" — environmental approval granted, 22.4 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 22.5 km away
- Proposed Forest land to be diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved, 22.9 km away
- CBWTF Facility ROYAL POLLUTION CONTROL SERVICES — cleared for impact study, 25.8 km away
- Project for Laying of Optical Fibre Cable (OFC) — under forest review, 34 km away
- Removal of Sand on Agriculture Land — initial checks, 35.9 km away
- Bharat Net — lapsed, 38.6 km away
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.