Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy Limited Retail Outlet is a lapsed fuel station in Amargarh, Moth, Jhansi, Uttar Pradesh. The site covers 1.1 acres.
Who is building it?
The applicant is M/S Nayara Energy Limited.
Has it been approved?
No. The application was lapsed on 18 Jul 2026, so it is no longer under consideration.
Where is it?
In Amargarh, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 1.1 acres and 2,280 m² of forest land.
When was it filed?
The application was filed on 19 Jul 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to Nayara Energy Limited Retail Outlet at Village: - Ammargarh, Tehsil:- Moth, District:- Jhansi. |
|---|---|
| Status | Lapsed |
| Status since | 18 Jul 2026 |
| Application filed | 19 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | M/S Nayara Energy Limited |
| Land area | 1.1 acres (0.4 ha) |
| Forest land | 2,280 m² |
| Project cost | ₹60 lakh |
| Village / locality | Amargarh |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07052 |
In context
31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 1.1 acres, this one is larger than 58% of them.
Where it is
Amargarh, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 5.7 km away
- Jhansi Link Expressway (From Bundelkhand Expressway to BIDA Connecting Jhansi… — more information requested, 6.9 km away
- Kukargaow Sand/Morrum Mining Project from Betwa River bed Gata no. 01k, Khand 2 — environmental approval granted, 7.3 km away
- Proposed project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 7.5 km away
- Proposed project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 7.5 km away
- "Sand/Morrum Mining" Project at Gata No.- 1055, 1107Mi., Village- Chelra,… — environmental approval granted, 7.5 km away
- "Sand/Morrum Mining" Project at Gata No.- 1055, 1107Mi., Village- Chelra,… — cleared for impact study, 7.5 km away
- Kukargaon Morrum Mining Project (Area- 30.3610 Ha.) — environmental approval granted, 7.8 km away
All 61 Nayara Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.