Quick answers
What is this project?
Jhansi Link Expressway (From Bundelkhand Expressway to BIDA Connecting Jhansi Defence Corridor– Total KMS- 0+000 TO 106+300 is a proposed road project in Karguwan, Moth, Jhansi, Uttar Pradesh.
Who is building it?
The applicant is Uttar Pradesh Expressways Industrial Development Authority (Upeida).
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Karguwan, Moth, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹813.6 crore.
When was it filed?
The application was filed on 1 Sept 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 20 Sept 2026 |
| Application filed | 1 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | Uttar Pradesh Expressways Industrial Development Authority (Upeida) |
| Project cost | ₹813.6 crore |
| Village / locality | Karguwan |
| Taluk / tehsil | Moth |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04704 |
In context
12 applications in Jhansi since January 2022 are in the same category (Roads & highways): 1 approved, 5 filed or under review, and 6 withdrawn, lapsed or rejected.
7 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Karguwan, Moth, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 3.8 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — under environmental review, 4.3 km away
- Proposed River Bed Sand/ Morrum Mining from Betwa River Bed at Araji No. 321 ,… — cleared for impact study, 4.3 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — environmental approval granted, 4.4 km away
- Transfer of Environmental Clearance for Sand/Morrum Mining project from Arazi… — environmental approval granted, 4.4 km away
- "Sand/Morrum Mining" at Betwa River Bed — environmental approval granted, 4.7 km away
- Proposed Forest Land to be diverted for construction of River Bridge — forest land use approved, 4.9 km away
- Sand/Morrum Mining From Betwa Riverbed — under environmental review, 5 km away
More from Uttar Pradesh Expressways Industrial Development Authority (Upeida) in Jhansi
- Proposed Forest Land to be diverted for Construction of Link Road — in-principle approval, conditions pending
- "Up Defence Industrial Corridor" — environmental approval granted
- "Up Defence Industrial Corridor" — lapsed
4 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects in Jhansi
All 39 Uttar Pradesh Expressways Industrial Development Authority (Upeida) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.