Quick answers
What is this project?
Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC) is a lapsed telecom project in Ahirahra, Sirathu, Kaushambi, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Jio Digital Fiber Private Limited.
Has it been approved?
No. The application was lapsed on 23 Aug 2026, so it is no longer under consideration.
Where is it?
In Ahirahra, Sirathu, Kaushambi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh; a site of 0.8 acres and 3,160 m² of forest land.
When was it filed?
The application was filed on 1 Jul 2026.
Project details
| Official title | Proposal of re-diversion for Jio Digital Fibre Private Limited Project for Laying of Optical Fibre Cable (OFC) along with road, within the already diverted RoW of roads at NH-19 {Kanpur-Fatehpur-Prayagraj Road (Kaushambi/Fatehpur Border to Kokhraj) Left/Right Side} from Km. 598.000 to Km. 628.000 of Total Km. 30.000 & 0.3162 Ha. in Kaushambi Forest Division, Kaushambi, District-Kaushambi-UP |
|---|---|
| Status | Lapsed |
| Status since | 23 Aug 2026 |
| Application filed | 1 Jul 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Jio Digital Fiber Private Limited |
| Land area | 3,200 m² |
| Forest land | 3,160 m² |
| Project cost | ₹75 lakh |
| Village / locality | Ahirahra |
| Taluk / tehsil | Sirathu |
| District | Kaushambi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07121 |
Where it is
Ahirahra, Sirathu, Kaushambi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Riverbed Ordinary sand mining having lease area 8.00 ha along River Ganga in… — under environmental review, 6.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — lapsed, 6.3 km away
- IOCL Retail Outlet on at KM 624.000 (Ch. 623.494 RHS) on NH-19 (Old NH-2) — forest land use approved, 10 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 16.4 km away
- "Ordinary Sand Mining" from Riverbed of Ganga River — more information requested, 18.3 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — in-principle approval, conditions pending, 19.1 km away
- Proposed Protected Forest Land to be diverted for Construction of 4-lane… — more information requested, 21 km away
- Terms of Reference (ToR) application for Environmental Clearance of cement… — cleared for impact study, 24.9 km away
All 787 Jio Digital Fibre projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.