Quick answers
What is "Ordinary Sand Mining" from Riverbed of Ganga River?
"Ordinary Sand Mining" from Riverbed of Ganga River is a proposed mining project in Nazarganj, Chail, Kaushambi, Uttar Pradesh. The site covers 24.7 acres.
Who is building it?
The applicant is Shivani Singh.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Nazarganj, Chail, Kaushambi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 24.7 acres.
When was it filed?
The application was filed on 25 Oct 2026.
Project details
| Official title | "Ordinary Sand Mining" from Riverbed of Ganga River at Village- Kokhraj Kachhar, Gata No.- 43 Ka Mi, 44 Lease area- 10.00 Ha., Tehsil- Sirathu, District- Kaushambi, Uttar Pradesh, Project Proponent- M/s Aditi Construction/606505 (Prop.- Smt Shivani Singh) |
|---|---|
| Status | More information requested |
| Status since | 29 Oct 2026 |
| Application filed | 25 Oct 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Shivani Singh |
| Land area | 24.7 acres (10 ha) |
| Project cost | ₹1 crore |
| Village / locality | Nazarganj |
| Taluk / tehsil | Chail |
| District | Kaushambi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04146 |
In context
32 applications in Kaushambi since January 2022 are in the same category (Mining): 20 approved, 10 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 11 months from filing to approval. At 24.7 acres, this one is smaller than 97% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Nazarganj, Chail, Kaushambi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 3.7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — in-principle approval, conditions pending, 4.3 km away
- IOCL Retail Outlet on at KM 624.000 (Ch. 623.494 RHS) on NH-19 (Old NH-2) — forest land use approved, 9.4 km away
- Riverbed Ordinary sand mining having lease area 8.00 ha along River Ganga in… — under environmental review, 14 km away
- Bhart Net — lapsed, 16.9 km away
- Proposal of re-diversion for Jio Digital Fibre Private Limited Project for… — lapsed, 18.3 km away
- Proposed Forest Land to be diverted for Four Lane connectivity from Kaushambi… — in-principle approval, conditions pending, 23.5 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — lapsed, 24.4 km away
About this information